By
NuBlu Energy
Category
Frac Sand
Published
2023
Clients
HRS Operations LLC

Aggregate Waste Stream Recycle System – Kermit, TX

Project Value: $1.2MM
Activities / Roles: General Contractor for turn-key installation.
Project Type: Brownfield

Project Description:
NuBlu Energy proudly presents a groundbreaking project that embodies our commitment to sustainability and efficiency. We embarked on a journey to construct an Aggregate Waste Stream Recycle System, a testament to our dedication to responsible resource management.

Innovative Structure: At NuBlu Energy, innovation drives everything we do. In this project, we erected a 3-story steel structure to house a dry screener, showcasing our dedication to efficiency and precision. This structure is a testament to our commitment to creating a more sustainable future.

Solid Foundation: The foundation of our project is rock-solid, both figuratively and literally. We poured over 800 cubic yards of concrete with meticulous care, ensuring the stability and durability of our facilities. This solid base reflects our commitment to quality and longevity.

Sustainable Storage: As part of our green initiative, we installed a substantial 1000-ton storage silo. This addition not only enhances our storage capacity but also contributes to responsible resource management, reducing waste and promoting sustainability.

Enhanced Efficiency: To optimize our operations, we integrated multiple conveyors and bucket elevators, ensuring the efficient handling and transport of materials within our facilities. This addition enhances our overall efficiency and reduces our environmental footprint.

Project Highlights:
  • Erected a 3-story steel structure for a dry screener.
  • Poured over 800 cu. yd. of concrete.
  • Installed 1000-ton storage silo.
  • Installed multiple conveyors and bucket elevators.