NuPresto 400 3-stage

One package. 150 to 600 psig in. CNG fill pressure out. The 3-stage NuPresto 400 covers the full 150 to 600 psig suction window in a single configuration. Same Fornovo DA300 frame and controls philosophy as the 2-stage NuPresto 400, with the staging and cooling needed to handle low and mid-range pipeline and RNG inlet pressures.

Overview The 3-stage NuPresto 400 is built for jobs where pipeline or RNG inlet pressure sits anywhere from 150 to 600 psig and CNG discharge still has to land at 3,900 psig. Three compression stages, three intercooler sections, and a final aftercooler keep stage temperatures and ratios inside the design envelope across the entire suction range – without forcing you to specify a separate booster or pick between sub-configurations.

Mechanically, it is the same NuPresto 400 platform: Fornovo Gas DA300 frame, non-lubricated water-cooled cylinders, PLC controls, and full FAT in shop.

Key Specifications:

• Compression Stages – 3-stage
• Compressor Frame – Fornovo Gas DA300 heavy-duty reciprocating
• Cylinders – Non-lubricated, water-cooled with HP valves
• Suction Pressure – 150 to 600 psig
• Discharge Pressure – Up to 3,900 psig (4,200 psig optional)
• Flow Rate – Up to 2.6 MMSCFD
• Driver – 300 to 400 HP electric motor (depends on suction pressure)
• Rated Speed – 1,200 rpm
• Interstage Cooling – 3-section air cooler plus engine jacket water (EJW) circuit
• Discharge Treatment – Interstage scrubbers and final discharge coalescer
• Cooling Package – Closed-loop glycol with multi-fan air cooler
• Control System – PLC-based with HMI; remote monitoring via Ewon
• Design Standards – ASME Sect. VIII Div. 1, B31.3, NEC, NFPA, API/ISO
• Skid –  Single skid, fully assembled and FAT tested in shop

Final flow and power are tuned to your gas analysis, suction conditions, and site requirements. Contact engineering for a sized proposal.

One Configuration, Wide Operating Window From RNG dryer outlets at 150 psig up to mid-pressure pipeline taps at 600 psig, the 3-stage covers it. No need to specify a sub-variant or commit to a narrow operating band on day one.

Three-Section Air Cooler with EJW Engineered air cooler with separate sections for each stage discharge plus engine/jacket water. Stage temperatures stay inside the design window even at 100 °F ambient and 3,000 ft elevation.

Same Frame, Same Controls, Same Service Plan Identical Fornovo DA300 bottom end, control philosophy, HMI, and remote monitoring as the 2-stage NuPresto 400. Same maintenance intervals on wear parts. Same spares stocked at our shop. Operators trained on one variant are trained on both.

Non-Lubricated Cylinders No oil carryover into the gas stream. Cleaner downstream equipment, less environmental risk, simpler permitting.

Engineered for Continuous Service Interstage scrubbers, pulsation control, and ASME-stamped vessels and coolers sized for 24/7 RNG and CNG mother station duty.

Built and Tested In-Shop Final assembly, FAT, loop checks, and HMI commissioning happen in our shop. Issues get caught in the shop, not on your site.

Typical Applications
• RNG-to-CNG mother stations off RNG dryer outlets
• Low and mid-pressure pipeline taps and lateral compression
• CNG fueling sites where inlet pressure is unstable or seasonally variable
• Virtual pipeline trailer filling (pairs with NuBlu VPT-64 / VPT-128)
• Wellhead and field gas compression with CNG offtake
• Replacement of aging multi-stage CNG packages on existing pads

What’s Included
• Single skid with 3-stage compressor, motor, multi-section air cooler, and process piping
• Inlet filter, three interstage scrubbers, and final discharge coalescer
• Closed-loop glycol cooling system with EJW circuit
• PLC, HMI, and field instrumentation, wired and tested
• Cause-and-effect diagram, control narrative, and FAT package
• ASME-stamped pressure vessels and coolers, B31.3 piping
• Installation, commissioning, and start-up procedure
• Recommended spare parts list and pricing

Engineering and Aftermarket Support Every 3-stage NuPresto 400 ships with a complete engineering package: P&IDs, GA drawings, electrical load lists, lifting and torsional analyses, and a full O&M manual. Critical spares – including complete cylinders – are stocked at our shop for fast response.
Field service, troubleshooting, and remote diagnostics are handled by the same team that designed and built the unit.

2-Stage vs 3-Stage at a Glance
• NuPresto 400 (2-Stage) → Suction 550 to 950 psig, up to 3.69 MMSCFD, ideal for high-pressure pipeline mother stations
• NuPresto 400 (3-Stage) → Suction 150 to 600 psig, up to 2.62 MMSCFD, ideal for RNG and low/mid-pressure pipeline service
• Overlap at 550 – 600 psig – engineering will recommend the better fit based on inlet stability and target flow

Request a sized proposal Send us your suction pressure, flow target, and discharge requirement, and we’ll come back with a configured NuPresto 400 package.

Need help ?

Ready to learn more about our exciting new products? Don’t miss out! Give us a call today, and our friendly experts will be happy to provide all the details you need. 

877-520-4018

[Click Here For 2-Stage]

NuPresto 400 Family at a Glance
 • Two-Stage → Suction 550 to 950 psig, up to 3.69 MMSCFD, ideal for high-pressure pipeline mother stations
• Three-Stage → Suction 150 to 600 psig, up to 2.6 MMSCFD, ideal for RNG and low/mid-pressure pipeline service
• Four-Stage → Suction 40 to 100 psig, up to 1.1 MMSCFD, ideal for declining wells, low-pressure RNG, and stranded gas

[Click Here For 4-Stage]

NuPresto 400 Family at a Glance
 • Two-Stage → Suction 550 to 950 psig, up to 3.69 MMSCFD, ideal for high-pressure pipeline mother stations
• Three-Stage → Suction 150 to 600 psig, up to 2.6 MMSCFD, ideal for RNG and low/mid-pressure pipeline service
• Four-Stage → Suction 40 to 100 psig, up to 1.1 MMSCFD, ideal for declining wells, low-pressure RNG, and stranded gas