Project Value: $5MM
Activities / Roles: Full EPC.
Project Type: Greenfield
Project Description: NuBlu Energy is thrilled to present a groundbreaking project that reflects our dedication to innovation and sustainability. We successfully completed the construction of the Striker 4 Oil Reclamation and Waste Injection Facility, a project that sets new standards in environmental responsibility and resource management.
Comprehensive Solutions: At NuBlu Energy, we excel in delivering comprehensive solutions. We executed a turn-key EPC (Engineering, Procurement, and Construction) project that encompasses every aspect of this facility, ensuring a seamless and efficient operation.
Versatile Waste Acceptance: This facility is designed to accommodate oil field waste through various means, whether it’s via trucks or pipelines. Our adaptability allows for efficient waste management, contributing to responsible resource utilization.
Cutting-Edge Washout Systems: We incorporated tanker washout systems equipped with automated high-pressure jets. These systems ensure thorough and efficient cleaning, maintaining the highest standards of hygiene and safety.
Advanced Reclamation Technology: To maximize resource recovery, we designed and installed 2-phase and 3-phase centrifuges for crude oil reclamation. This innovative approach not only enhances efficiency but also aligns with our commitment to sustainable practices in the oil industry.
At NuBlu Energy, we don’t just construct facilities; we’re shaping the future of oil reclamation and waste management. Join us on our journey towards innovation, precision, and environmental responsibility as we continue to pioneer excellence in construction. Experience the difference with NuBlu Energy.